Plumbing in and David running electrical
Thursday, October 11, 2012
Wednesday, October 10, 2012
Plumbing Stub-Ups
The plumber has been working for the past couple of days making sure everything is in the correct spot. He should be running water lines on Wednesday. Hopefully I can get the electric installed in slab and be ready to pour by the end of the week.
Waffle Slab
The slab is roughly on a 9' grid with 12W" x 32"D beams. Each of the beams will contain (2) post tension cables in the base and a slab tendon in the 5" slab. Hopefully it will function similar to a boat and float on my clay filled soil.
Electric Line Extension
Working on extending my existing 200A service from my existing meter loop to the house. I ran the conduit 2/3 of the way and am waiting for the slab pour to complete.